Hobsonville Overpass Wall
1400 Soil nails were installed on this project. There is 3000m² of Shot crete wall that is held entirely by soil nails. The dead line for these walls were critical, as they were to enable 355,000m³ of excavation before the wet winter months. Ancor Loc completed the project on time, which was considered un-achievable by others.



Cambridge to Karapiro Cycleway
Ancor loc used an alternative design to win the 110 metre long Crow’s Nest section of the Cambridge to Karapiro Cycleway. This section of the cycleway was to be cantilevered from the road edge and overhanging a steep drop down to the Waikato River. The rowing world championships were being held at Karapiro so the two month deadline was critical. We replaced the original precast counter weighted structure design with a more economical and efficient design. Using ground anchors, steel beams and precast double tees, the cost and time frame were in our favour. The Epoxy-Loc Anchors ranged from 7 – 20+ metres long.



Kennedy Park Beach Access
This site was very steep and the foundations were a combination of timber poles, micro piles and ground anchors. Anchor Loc’s Epoxy-Loc coating was used to protect the ground anchors from the corrosive elements they would face.



More Case Studies
Soil Nail Mesh Slope, Totara Heights, Auckland
Stabilizing the slope was a requirement for consent on this site. A special rig was used to install these soil nails. The distance from the building to the slope was a mere 1.3 metres in places.
Newmark Rail Bridge
Temporary soil nails to support a bridge abutment, while the rail tracks were lowered.
Soil Nails – Concrete Soldier Pile Walls
Constellation Drive Bus Way North Shore, Auckland
Soil Nails – Concrete Soldier Pile Walls
Whiritoa Dropout
Slip Stabilization, EQC Claim
Browns Road, Ohope, Eastern BOP