Cambridge to Karapiro Cycleway

Ancor loc used an alternative design to win the 110 metre long Crow’s Nest section of the Cambridge to Karapiro Cycleway. This section of the cycleway was to be cantilevered from the road edge and overhanging a steep drop down to the Waikato River. The rowing world championships were being held at Karapiro so the two month deadline was critical. We replaced the original precast counter weighted structure design with a more economical and efficient design. Using ground anchors, steel beams and precast double tees, the cost and time frame were in our favour. The Epoxy-Loc Anchors ranged from 7 – 20+ metres long.